Xref: utzoo sci.space:14503 sci.space.shuttle:3737 Path: utzoo!attcan!utgpu!jarvis.csri.toronto.edu!mailrus!uwm.edu!gem.mps.ohio-state.edu!usc!henry.jpl.nasa.gov!elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalke From: baalke@mars.jpl.nasa.gov (Ron Baalke) Newsgroups: sci.space,sci.space.shuttle Subject: Galileo Update Message-ID: <1875@jato.Jpl.Nasa.Gov> Date: 9 Oct 89 17:21:37 GMT Sender: news@jato.Jpl.Nasa.Gov Reply-To: baalke@mars.jpl.nasa.gov (Ron Baalke) Distribution: usa Organization: Jet Propulsion Laboratory, Pasadena, CA. Lines: 86 GALILEO DAILY REPORT 6 OCTOBER 1989 General Spacecraft CDS memory loading on logic power was completed successfully on 3 and 4 October. On 4 October, the spacecraft was turned on so as to be able to verify L-20 min discrete from the IUS after the changeout of the IUS computer A. In addition, both the spacecraft and the IUS performed stray voltage tests to the spacecraft to insure the super zip detonator block connector pins have no voltage while the spacecraft and the IUS is on. In the early morning of 5 October, the super zip detonator block firing cables were connected to the spacecraft and FTK checks were performed thus completing all of the spacecraft pryotechnic preflight activities. In the early morning of 6 October, closeout operations were performed; PWS dipole antennas were installed, the science purge was transferred to the T-0 source via the 4 way valve. The cabling to the spacecraft from the support equipment simulated RTG power supply was disconnected and the final spacecraft cleanliness inspection and cleaning was performed. The only remaining mechanical activity is the disconnection and capping of the carry-on umbilicals, and the installation of the related thermal blanket. LCET LCET #1 CDS ground support computer was exercised to assure that spacecraft memory loading was functioning; memory loading by the computer was successful. RTG Cooling Loop Vacuum drying of the payload portion of the cooling loop is still on-going; results to date indicate that the "dry" specifications will be satisfied prior to servicing the loop with water/alcohol. STS IUS: On 4 October, the IUS went into their ordnance operations at the completion of the computer A replacement and retest. The ordnance operations were reported as having been completed satisfactorily. Schedule Discussion and Assessment As discussed in the report of 4 October, a new payload schedule has been issued. The highlights of the schedule are as follows: 4 Oct-5 Oct IUS/GLL closeout operations 6 Oct 0800-1600 RTG preparations for transfer to Pad 1000-1400 Payload contamination inspection and cleaning 6 Oct-7 Oct 1600-0200 Reconfigure PGHM for RTG operations 7 Oct 0200-0500 JPL Launch Complex 39-B preparations for RTG operations 1700-1900 Transport RTGs to Pad B 7 Oct-8 Oct 1900-0700 Install RTGs in spacecraft and air bath operations 8 Oct 0400-1600 Galileo Launch Conditioning 0600-2100 RTG Coolant Servicing Functional Test 9 Oct 0400-0600 Disconnect Galileo carry-on umbilicals and final closeout 9 Oct 0800 Launch Countdown start L-76 hr T-43 hr