Xref: utzoo sci.space:15083 sci.space.shuttle:3943 sci.astro:5583 Path: utzoo!attcan!utgpu!jarvis.csri.toronto.edu!mailrus!uwm.edu!gem.mps.ohio-state.edu!usc!henry.jpl.nasa.gov!elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalke From: baalke@mars.jpl.nasa.gov (Ron Baalke) Newsgroups: sci.space,sci.space.shuttle,sci.astro Subject: KSC Payload Update (Forwarded) Message-ID: <2037@jato.Jpl.Nasa.Gov> Date: 27 Oct 89 23:57:24 GMT Sender: news@jato.Jpl.Nasa.Gov Reply-To: baalke@mars.jpl.nasa.gov (Ron Baalke) Distribution: usa Organization: Jet Propulsion Laboratory, Pasadena, CA. Lines: 36 DAILY STATUS/KSC PAYLOAD MANAGEMENT AND OPERATIONS 10-27-89 - STS-31 HST (AT VPF) - GSE CONFIGURATION SETUP FOR BATTERY CHARGING HAS BEEN COMPLETED. DUE TO A PROBLEM ESTABLISHING THE HST SINGLE POINT GROUND, BATTERY CHARGING AND THE HST FUNCTIONAL TESTS HAVE BEEN DELAYED. PERSONNEL ARE SUPPORTING THE CONTINUOUS VPF ENVIRONMENTAL AND ECS UNIT MONITORING. ACCESS PLATFORMS AND THE HST FLYING CARPET HAVE BEEN REMOVED FROM THE VPF. - STS-35 ASTRO-1/BBXRT (AT O&C) - AFTER REMOVAL OF A MICROSWITCH, A 0.156 INCH DIAMETER VIDEO PROBE WAS USED TO AID IN THE SEARCH FOR THE MISSING WASHER. THE WASHER WAS LOCATED IN THE PGSA-1 MOTOR AREA AND EVALUATION IS ACTIVE TO DETERMINE THE METHOD OF RETRIEVAL. MUE INSTALLATION AND RPA CHECKS ARE ACTIVE. - STS-40 SLS-1 (AT O&C) - RACK 7 AND 10 STIFFENER MOD ACTIVITIES HAVE BEEN PLACED ON HOLD PENDING DESIGN CENTER RESOLUTION OF THE COUNTERSINK RIVET ISSUE. PREPS FOR PROOFLOAD OF MVAK JOGGLE EQUIPMENT AND WATER SERVICING GSE PREPS AND VALIDATION ARE IN WORK. - STS-42 IML (AT O&C) - ECLS CLOSEOUT CAP VERIFICATION WAS COMPLETED. Ron Baalke | (818) 541-2341 x260 Jet Propulsion Lab M/S 301-355 | baalke@mars.jpl.nasa.gov 4800 Oak Grove Dr. | Pasadena, CA 91109 |