Path: utzoo!attcan!uunet!bu.edu!rpi!zaphod.mps.ohio-state.edu!samsung!cs.utexas.edu!milano!ncr-sd!ncrlnk!ncrwat!swdev!neil From: neil@swdev.Waterloo.NCR.COM (Neil A. Law) Newsgroups: ncr.sys.pcdos,comp.windows.ms Subject: MS Project For Windows (Out of Memory) Keywords: win3.0, ms project Message-ID: <869@ncrwat.Waterloo.NCR.COM> Date: 19 Jul 90 13:10:10 GMT Sender: news@ncrwat.Waterloo.NCR.COM Distribution: na Lines: 56 I am currently evaluating Microsoft Project for Windows 1.0 (MPW) to see if we should migrate from Project 4.0. I'm almost convinced we should buy it except for one TINY problem, I cannot get MPW to generate a plot file (we need this to send the print job to a remote plot server). I'm under a pressing deadline to resolve this so I'm posting this to the net in hopes of getting some clues on how to fix the problem. As part of the evaluation I picked up an existing set of project files, converted them to MPW format and tried to generate the plot file. MPW thinks about it for a while and after about 15 seconds I get a popup window saying "Out of Memory" (I end up with a 0 length file as a result). Vital Statistics: o 386 IBM Compatible (NCR PC386/25), with 100MB disk and 4MB extended Memory, 0 expanded. 529,504 bytes free memory before windows is loaded o Windows 3.0 with 9167K Free Memory, 81 % of resources free, running in 386 Enhanced Mode (8967KB Free Conventional Memory and 0 expanded memory in MPW) o printer is HP Plotter on File, device 7585A with E size drawings o config.sys files= 30 buffers=20 break=on device=C:\win3\himem.sys device=c:\bin\ansi.sys shell=c:\bin\command.com c:\bin /P /E:512 device=C:\WIN3\smartdrv.sys 1792 512 device=C:\WIN3\ramdrive.sys 1280 /e lastdrive=n: o no other applications running when running MPW o MPW was installed in a program group by selecting its ICON from the file manager and moving it over to the program group (i.e. no PIF file was created) I'd appreciate any quick pointers on ways to correct this. I know I should read the manuals but I'm in a bit of a rush. I've only got the package for evaluation until next week and am doing the evaluation as an outside core hours (i.e. my own time) activity (too many other things to do :->). Please email any responses to the address below. -- ========================================================================== >>>> Neil Law, Document Management Systems <<<< 519-884-1710 x499 E&M Waterloo, NCR Canada Ltd, 580 Weber St. N., Waterloo, Ont. N2J 4G5 Neil.A.Law@Waterloo.NCR.COM uunet!ncrlnk!ncrwat!swdev!neil