Xref: utzoo sci.space:25427 sci.astro:10317 Path: utzoo!attcan!uunet!zaphod.mps.ohio-state.edu!usc!elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalke From: baalke@mars.jpl.nasa.gov (Ron Baalke) Newsgroups: sci.space,sci.astro Subject: Magellan Update - 11/12/90 Keywords: Magellan, JPL Message-ID: <1990Nov12.220502.28617@jato.jpl.nasa.gov> Date: 12 Nov 90 22:05:02 GMT Sender: news@jato.jpl.nasa.gov Reply-To: baalke@mars.jpl.nasa.gov (Ron Baalke) Organization: Jet Propulsion Laboratory, Pasadena, CA. Lines: 21 Nntp-Posting-Host: mars.jpl.nasa.gov MAGELLAN STATUS REPORT November 12, 1990 The Magellan spacecraft performance is nominal. The spacecraft successfully accepted commands on Friday, November 9, resuming mapping on orbit 787 at 4:07 am PST on Saturday, November 10. One STARCAL (star calibration) occurs every orbit and 1 DESAT (desaturation of the reaction wheels) every 4th orbit. 16 STARCALS and 4 DESATS have been done since mapping resumed. A sequence patch to disable solar array control during mapping has prevented the spacecraft vibration from recurring. Track 1 of tape recorder B was successfully played back on November 9. It contains the results of STARCALS performed during Superior Conjunction. ___ _____ ___ /_ /| /____/ \ /_ /| | | | | __ \ /| | | | Ron Baalke | baalke@mars.jpl.nasa.gov ___| | | | |__) |/ | | |___ Jet Propulsion Lab | baalke@jems.jpl.nasa.gov /___| | | | ___/ | |/__ /| M/S 301-355 | |_____|/ |_|/ |_____|/ Pasadena, CA 91109 |