Xref: utzoo sci.space:25469 sci.astro:10339 Path: utzoo!utgpu!news-server.csri.toronto.edu!cs.utexas.edu!sdd.hp.com!zaphod.mps.ohio-state.edu!samsung!hubdub!yetmank From: yetmank@merrimack.edu Newsgroups: sci.space,sci.astro Subject: Re: Magellan Update - 11/12/90 Message-ID: <20538.273ffbf3@merrimack.edu> Date: 13 Nov 90 13:58:11 GMT References: <1990Nov12.220502.28617@jato.jpl.nasa.gov> Organization: Merrimack College, No. Andover, MA Lines: 30 In article <1990Nov12.220502.28617@jato.jpl.nasa.gov>, baalke@mars.jpl.nasa.gov (Ron Baalke) writes: > MAGELLAN STATUS REPORT > November 12, 1990 > > The Magellan spacecraft performance is nominal. The spacecraft > successfully accepted commands on Friday, November 9, resuming mapping on > orbit 787 at 4:07 am PST on Saturday, November 10. One STARCAL (star > calibration) occurs every orbit and 1 DESAT (desaturation of the reaction > wheels) every 4th orbit. 16 STARCALS and 4 DESATS have been done since > mapping resumed. > > A sequence patch to disable solar array control during mapping has > prevented the spacecraft vibration from recurring. Track 1 of tape recorder B > was successfully played back on November 9. It contains the results of > STARCALS performed during Superior Conjunction. > ___ _____ ___ > /_ /| /____/ \ /_ /| > | | | | __ \ /| | | | Ron Baalke | baalke@mars.jpl.nasa.gov > ___| | | | |__) |/ | | |___ Jet Propulsion Lab | baalke@jems.jpl.nasa.gov > /___| | | | ___/ | |/__ /| M/S 301-355 | > |_____|/ |_|/ |_____|/ Pasadena, CA 91109 | Perhaps a dumb question (I'm full of those, believe me!) What's the JPL/NASA going to do with the Magellan probe when it's done mapping Venus? Kevin