Path: utzoo!utgpu!news-server.csri.toronto.edu!cs.utexas.edu!usc!zaphod.mps.ohio-state.edu!pacific.mps.ohio-state.edu!linac!att!pacbell.com!ames!trident.arc.nasa.gov!yee From: yee@trident.arc.nasa.gov (Peter E. Yee) Newsgroups: sci.space.shuttle Subject: Shuttle Status for 12/05/90 (Forwarded) Message-ID: <1990Dec5.175524.17039@news.arc.nasa.gov> Date: 5 Dec 90 17:55:24 GMT Sender: usenet@news.arc.nasa.gov (USENET Administration) Reply-To: yee@trident.arc.nasa.gov (Peter E. Yee) Organization: NASA Ames Research Center, Moffett Field, CA Lines: 52 KSC SHUTTLE STATUS REPORT - Wednesday, Dec. 5, 1990 9:30 a.m. STS-35 - COLUMBIA (OV 102) At Hangar AF on the Cape Canaveral Air Force Station, work is continuing to disassemble the two solid rocket boosters. Today, the tunnel covers and linear shaped charges will be removed. The boosters will be disassembled at Hangar AF in preparation for refurbishment. Landing is planned for Dec. 11 at about 11:25 p.m. EST on Rogers Dry Lake Bed at Edwards Air Force Base, Calif. After about five days of turnaround operations, the orbiter will be ferried back to Florida. The 747 shuttle carrier aircraft/orbiter will be making several refueling stops across the country because of the extra weight due to Astro. STS-39 - DISCOVERY (OV 103) - OPF BAY 1 Operations scheduled this week include freon servicing, tests of the Ku-band antenna, Tacan system tests, and tests of the main propulsion system pneumatic system. Tests are continuing to verify the internal screens of the right orbital maneuvering system (OMS) at the Hypergolic Main- tenance Facility (HMF). Tests are continuing this week with the pod in a horizontal position. A getaway special beam is being installed in the payload bay today. Preparations are underway to braze in gaseous helium check valves for engines 2 and 3 this week. STS-37 - ATLANTIS (OV 104) - OPF BAY 2 The bay was cleared of all non-essential personnel this morning so that technicians could disconnect the left orbital maneuvering system pod from the orbiter. The bay will be reopened later today. The pod will be removed tomorrow afternoon and transferred to the HMF on Saturday. Main engine drying operations are planned tomorrow. Next week, heat shields will be removed in preparation for removal of the three main engines late next week. A test of the orbiter's interior and exterior lighting system is underway. STS-39 SOLID ROCKET BOOSTERS - VAB Stacking operations are continuing in the VAB. A minor debond between the inhibitor and case is being repaired on the right forward center segment. The segment will be lifted Friday night for mate. Brought to you by Super Global Mega Corp .com