Xref: utzoo sci.space:27546 sci.astro:11593 Path: utzoo!utgpu!news-server.csri.toronto.edu!cs.utexas.edu!swrinde!elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalke From: baalke@mars.jpl.nasa.gov (Ron Baalke) Newsgroups: sci.space,sci.astro Subject: Pioneer 10 Update - 02/08/91 Keywords: Pioneer 10 Message-ID: <1991Feb8.210411.10927@jato.jpl.nasa.gov> Date: 8 Feb 91 21:04:11 GMT Sender: news@jato.jpl.nasa.gov Reply-To: baalke@mars.jpl.nasa.gov (Ron Baalke) Organization: Jet Propulsion Laboratory, Pasadena, CA. Lines: 16 Nntp-Posting-Host: mars.jpl.nasa.gov PIONEER 10 STATUS REPORT February 8, 1991 Three sets of roll reference scans of the star Sirius, using the IPP (Imaging Photopolarimeter) instrument, were made on January 25. On February 4, a power failure at 70 meter Goldstone station resulted in a 37 minute loss of telemetry data. During the same track, 2 commands were aborted at the DSS (Deep Space Station). The numerous command aborts that have been occurring at the DSS's are being investigated by JPL. ___ _____ ___ /_ /| /____/ \ /_ /| Ron Baalke | baalke@mars.jpl.nasa.gov | | | | __ \ /| | | | Jet Propulsion Lab | ___| | | | |__) |/ | | |___ M/S 301-355 | It's 10PM, do you know /___| | | | ___/ | |/__ /| Pasadena, CA 91109 | where your spacecraft is? |_____|/ |_|/ |_____|/ | We do!