Path: utzoo!utgpu!operator From: operator@utcs.utoronto.ca (UTCS Operator) Original-To: nsr@madhaus.utcs.utoronto.ca Subject: MCL2 reboot Original-Cc: noc Message-ID: <91Apr8.061751edt.18550@gpu.utcs.utoronto.ca> Date: Mon, 8 Apr 1991 06:17:21 -0400 Newsgroups: ut.nets.reports Distribution: ut Sender: postmaster@utcs.utoronto.ca Approved: postmaster@utcs.utoronto.ca Lines: 6 8-April 06:12. MCL2 GPB connectivity was interrupted for a brief period between 05:54 - 05:58. A reboot was done in an attempt to resolve network problem. This outage affect the downstrem nodes, scb, mike and sickkids. Sam Pun, Network Operations Centre.