Relay-Version: version B 2.10 5/3/83; site utzoo.UUCP Posting-Version: version B 2.10.1 6/24/83; site alice.UUCP Path: utzoo!watmath!clyde!floyd!harpo!eagle!mhuxl!ulysses!allegra!alice!alb From: alb@alice.UUCP (Adam L. Buchsbaum) Newsgroups: net.columbia Subject: Re: Re: RMS Attempt to be Made Message-ID: <2700@alice.UUCP> Date: Tue, 10-Apr-84 19:23:24 EST Article-I.D.: alice.2700 Posted: Tue Apr 10 19:23:24 1984 Date-Received: Wed, 11-Apr-84 07:32:13 EST References: <416@ihlts.UUCP> Organization: AT&T Bell Laboratories, Murray Hill Lines: 5 The operation with Nelson and the MMU thrust was (thought to be) necessary to stop the spin of the satellite. This spin was not stopped from the ground; rather, the tumbling and wobbling was stopped. The satelite was still spinning when it was grabbed with the RMS.