Relay-Version: version B 2.10 5/3/83; site utzoo.UUCP Posting-Version: version B 2.10.1 6/24/83; site proper.UUCP Path: utzoo!watmath!clyde!akgua!sdcsvax!sdcrdcf!hplabs!hpda!fortune!amd70!dual!proper!mickey From: mickey@proper.UUCP (Michael Thompson) Newsgroups: net.misc Subject: New (improved) IBM o.s. Message-ID: <1197@proper.UUCP> Date: Mon, 7-May-84 14:51:42 EDT Article-I.D.: proper.1197 Posted: Mon May 7 14:51:42 1984 Date-Received: Sat, 12-May-84 07:11:39 EDT Organization: Proper UNIX, San Leandro, CA Lines: 50 . IBM Data Processing Division Programming Announcement April 1, 1984 New Operating System "Because so many users have asked for an operating system of even greater capability than VM, IBM announces the Virtual Universe Operating System - OS/VU. "Running under OS/VU, the individual user appears to have not merely a machine of his own, but an entire universe of his own, in which he can set up and take down his own programs, data sets, system networks, personel, and planetary systems. He need only specify the universe he desires, and the OS/VU system generation program (IEHGOD) does the rest. This program will reside in SYS1.GODLIB. The minimum time for this function is 6 days of activity and 1 day of review. In conjunction with OS/VU, all system utilities have been replaced by one program (IEHPROPHET) which will reside in SYS1.MESSIAH. This program has no parameters or control cards as it knows what you want it to do when it is executed. "Naturally, the user must have attained a certain degree of sophistocation in the data processing field if an efficient utilization of OS/VU is to be achieved. Frequent calls to nonresident galaxies, for instance, can lead to unexpected delays in the execution of a job. Although IBM, through its wholly-owned subsidiary, The United States, is working on a program to upgrade the speed of light and thus reduce the overhead of extraterrestrial and meta-dimensional paging; users must be careful for the present to stay within the laws of physics. IBM must charge an additional fee for violations. "OS/VU will run on any IBM x0xx equipped with Extended Warp feature. Rental is twenty million dollars per CPU/nanosecond. "Users should be aware that IBM plans to migrate all existing systems and hardware to OS/VU as soon as our engineers effect one output that is (conceptually) error free. This will give us a case to develop an even more powerful operating system, target date 2001, designated 'Virtual Reality'. OS/VR is planned to enable the users to migrate to totally unreal universes. To aid the user in identifying the difference between 'Virtual Reality' and 'Real Reality', a file containing a linear arrangement of multisensory total records of successive moments of now will be established. It's name will be SYS1.EST." Michael Thompson