Relay-Version: version B 2.10 5/3/83; site utzoo.UUCP Posting-Version: version B 2.10.2 9/5/84; site omen.UUCP Path: utzoo!watmath!clyde!burl!ulysses!gamma!epsilon!zeta!sabre!petrus!bellcore!decvax!decwrl!pyramid!hplabs!tektronix!reed!omen!caf From: caf@omen.UUCP (Chuck Forsberg WA7KGX) Newsgroups: net.space Subject: Re: Redesign booster seals? Message-ID: <306@omen.UUCP> Date: Wed, 5-Mar-86 07:27:54 EST Article-I.D.: omen.306 Posted: Wed Mar 5 07:27:54 1986 Date-Received: Fri, 7-Mar-86 07:46:32 EST References: <1472@decwrl.DEC.COM> Reply-To: caf@omen.UUCP (Chuck Forsberg WA7KGX) Organization: Omen Technology, Portland Lines: 18 According to Mar 3 AW&ST, the following changes may be made to the SRBs: Add high strength bolts in thr area of the 177 pins joining the segments Catches similar to joints on the new composite SRB's Changes in insulation putty Improved O-ring seals, possible the .291 in diameter seals used in the composite SRB's, permanently sealed. External band heaters According to Mulloy, there are 829 Criticality 1 items on the shuttle, including 213 on the SRB system. Could somebody from Nasa post some of that list?