Relay-Version: version B 2.10 5/3/83; site utzoo.UUCP Posting-Version: version B 2.10.3 4.3bsd-beta 6/6/85; site mit-trillian.MIT.EDU Path: utzoo!watmath!clyde!burl!ulysses!allegra!mit-eddie!mit-trillian!speter From: speter@mit-trillian.MIT.EDU (Peter Osgood) Newsgroups: net.railroad Subject: B&M/AMTRAK Message-ID: <403@mit-trillian.MIT.EDU> Date: Mon, 5-May-86 11:10:43 EDT Article-I.D.: mit-tril.403 Posted: Mon May 5 11:10:43 1986 Date-Received: Tue, 6-May-86 07:14:06 EDT Reply-To: speter@trillian.UUCP (Peter Osgood) Distribution: net Organization: MIT, Project Athena, Cambridge, MA Lines: 12 Keywords: The strike spreads . . As of Friday, May 2, Amtrak discontinued the Montreal/Springfield portion of the "Montrealer" with the train running only between Springfield and Washington. The sleeping car and "Piano Car" were also dropped. This action was taken due to the continuing strike on the B&M. It will be restored when the strike ends. This was reported by the Sunday Boston Globe, May 4. peter osgood