Relay-Version: version B 2.10 5/3/83; site utzoo.UUCP Path: utzoo!linus!husc6!rutgers!iuvax!pur-ee!uiucdcs!uiucdcsp!jenks From: jenks@uiucdcsp.UUCP Newsgroups: sci.space.shuttle Subject: Re: Shuttle Fixes Message-ID: <79100008@uiucdcsp> Date: Sat, 7-Nov-87 03:34:00 EST Article-I.D.: uiucdcsp.79100008 Posted: Sat Nov 7 03:34:00 1987 Date-Received: Wed, 11-Nov-87 04:55:24 EST References: <6897@mhuxu.UUCP> Lines: 22 Nf-ID: #R:mhuxu.UUCP:6897:uiucdcsp:79100008:000:1010 Nf-From: uiucdcsp.cs.uiuc.edu!jenks Nov 7 02:34:00 1987 When I was interviewing at JSC, they where hard at work fixing other things than the SRB joints. One of my keepers-of-the-day said that they had basically taken the Shuttle operations procedures apart piece-by-piece, and they were now in the process of putting it all back together. He said that they really needed the down-time they've had to get everything working and more thoroughly debugged. My impression was that with a launch every month (or every other), they were too busy launching to plan for launches. There were several places in mission planning (especially contingency plans) that have really benefitted by the extended down-time. I wish they'd taken the time to do it right the first time, but I'd love to get in there and help them out. They need a programmer/engineer. I need a job. I hope we can get together. -- Ken Jenks, MS: Aero/Astro Engineering, BS: Computer Science, UIUC Looking for job in space. Help, anyone? jenks@p.cs.uiuc.edu {ihnp4!pur-ee}uiucdcs!uiucdcsp!jenks